Jobs always end up taking longer than you would have first estimated. I had originally hoped to finish laying tile and grouting during the past week, but that did not happen. Instead, I finished things up this afternoon. I’ll be able to get the toilet out of the bath tub(!?) tomorrow when the grout is sufficiently cured and after I put the trim up. At least the downstairs bathroom is completely done.
- Upstairs tile down.
- Grout applied.
- Downstairs tile done (with Lucy).