Monthly Archive: July 2011

Jul 03

Blank canvas stage

20110703-050112.jpg

We’re almost to the blank canvas stage. Almost all the mortar is off the subfloor, and there’s precious little to haul out of the room. The time to start building is almost upon us!
 

Jul 02

Tile removal

The good tile

 
 
We were able to loosen all the bathroom tile in about 20 minutes. It was a combination of the tile not adhering to the mortar and the mortar not adhering to the subfloor.

» Newer posts