We’re almost to the blank canvas stage. Almost all the mortar is off the subfloor, and there’s precious little to haul out of the room. The time to start building is almost upon us!
We were able to loosen all the bathroom tile in about 20 minutes. It was a combination of the tile not adhering to the mortar and the mortar not adhering to the subfloor.