The floorboards, plumbing and electrical are in. We got the bathtub moved to roughly where it needs to be, and I’ve begun construction if the surround.
Once we get the tub’s plumbing connected and do a water tightness test, we finish the surround and begin tiling the floor.
Monthly Archive: August 2011
Aug 31
Bathroom progress
Aug 13
Sisters, sisters, there were never such devoted sisters!
Baby boy and I have been working at putting sister joists in. The existing joists are way out of level. Some are as much as 1.125″ too low. Yikes! I suppose that’s what happens when you have 1,000 lbs of water + people on the floor…
Basically the procedure is to grab the level, place a …