It’s getting close to time for laying the tile. I’ve got my foam shower form, drain, and most of the waterproofing membrane in.
Monthly Archive: September 2011
Sep 24
Underlayment city
Sep 11
Tile
Sep 06
Blaze orange
After pressure testing the plumbing and testing out the bathtub drain, the next thing up was to finish the last of the framing around the tub. That was a breeze.
The next step was to get the bathroom cleaned, put the remaining drywall on the studs, and finally: I put the tile underlayment down. I picked …