Monthly Archive: September 2011

Sep 24

Underlayment city

Shower Walls

It’s getting close to time for laying the tile. I’ve got my foam shower form, drain, and most of the waterproofing membrane in.
 
 

Sep 11

Tile

I got the vast majority of the tile down. With any luck, we’ll get the shower underpayment next week, then I’ll get that tiled next weekend. Then we follow that up with grout. What fun 😛

Sep 06

Blaze orange

Ditra ready to roll

After pressure testing the plumbing and testing out the bathtub drain, the next thing up was to finish the last of the framing around the tub. That was a breeze.
The next step was to get the bathroom cleaned, put the remaining drywall on the studs, and finally: I put the tile underlayment down. I picked …