Blaze orange

After pressure testing the plumbing and testing out the bathtub drain, the next thing up was to finish the last of the framing around the tub. That was a breeze.

The next step was to get the bathroom cleaned, put the remaining drywall on the studs, and finally: I put the tile underlayment down. I picked the Schlüter Ditra underlayment that Home Depot carries… It should be pretty bulletproof, and it’s easy to waterproof if we want that. (We won’t go that far.) I’m going to use the Schlüter shower system as well. We’ll be ordering that next week.

So until I get the tile cut to fit, we have a blaze orange floor in the bathroom. Wildlife beware!